Delivery of bathroom tiles arrived today. Wagon driver had a bit of a problem manouvering the crate off the back of his wagon and placing near to the kerb.
22 square metres of travertine tiles plus adhesive and grout to be carried from the roadside,
up the front steps and into the cottage...one achey back later and they are all safely stacked inside.
Tiling hopefully to commence on Monday...