The central part of loft is now boarded, this is to be used for a "Boys Toys" area..hopefully eventually to have a train set up there.
The plumber and electrician hve diverted cables and pipes away from this area.
A new timber loft ladder and loft hatch has been installed for easier access from the hallway.