Bathroom Tiling

Tiler has begun work on fitting tiles to walls, together with edging border.
It's taken me weeks to decide on which style/type/colour of tile to choose, but love them now I can see them in situ...opted for natural Travertine stone.





Electrician recommended that we lay floor levelling compound before insulation mats are laid for underfloor heating to give a more level base... this has now been done, waiting for it to dry.


Tiles still need to be grouted and sealed

1 Sept 2011

Plumbing for Shower Tray

Plumber been to cottage today to make the drain for the shower tray, not an easy job as its being set into a concrete floor, and the drain needed to be set in a channel dug into the concrete outside